Milestones

Development Of Sanitary Facilities Complex in Muzdalifah and Arafatt

Project Name: Development of water supply networks for toilets in the Holy Places

Owner:  Kidana for Development & Progress Company

Project Value: SR 46M

Project Completion: in progress

Project description: Development of water irrigation networks for 2000 toilets covering a total area of 4,000,000 m2 in the Holy

Places – in Mecca – installation of water distribution networks with a total length of 250,000m, installation of 2000 electrical

breakers

Implementation of the electrical infrastructure for the pilgrims' abroad camps of foreign pilgrims in the Arafat-3 area

Project Name: Implementation of the electrical infrastructure for the pilgrims’ abroad camps of foreign pilgrims in the Arafat-3 area

Owner:  Kidana for Development & Progress Company

Project Value: SR 138M

Project Completion: In progress

Project description: External pathways works – Fencing and gates works – Replanting trees conflicting with development works – Electrical systems and necessary infrastructure works to power the camps.

Gray water treatment plant Saudi Telecom Company (STC) headquarter-Riyadh.

Project Name: Gray water treatment plant Saudi Telecom Company (STC) headquarter-Riyadh.

Owner:  Saudi Telecom Company (STC)

Project Value: SR 23M

Project Completion: In progress.

Project description:  Greywater treatment plant with a capacity of 350 m3/day, treated water tank with a capacity of 2100 m3 – greywater tank with a capacity of 200 m3 – greywater piping network consisting of UPVC pipes with various diameters and accessories with a
total length of 2630 m – treated water piping network consisting of flexible cast iron pipes with various diameters and accessories with a total length of 2605m

Establishing system for transporting and distributing treated water for irrigation from Mantouha station to Al-Amartya and Al-Uyyah

Project Name: rehabilitation of the treated water conveyor line from Manfuha station to Al-Ammariya – Phase 1

Owner:  Saudi Irrigation Organization

Project Value: SR 156M

Project Completion: On-going

Project description: Supply and installation of ductile pipes for the main irrigation network with diameters from 300 mm to 1200 mm
with a length of 65 km and polyethylene pipes with a diameter of 160 mm and 200 mm with a length of 8 km – Irrigation sub-network
of polyethylene pipes for diameters from 250 mm to 110 mm with a total length of 52 km – 67 Air Valve chambers – 69 wash valve
chambers – 219 benificaries chambers – 2 flow chamber – 229 lock valve chambers – 10 actuator Motarized valve chambers – 1km
Cathodic protection for all pipe diameters -thrust poring – 72 RTU’s for the main lines and for the benificaries outlet

Wastewater Collection System Networks Project

Project Name: Wastewater collection system networks for Sabya city in Jazan

Owner:  Ministry of Environment, Water and Agriculture – Gazan Water Services Department

Project Value: SR 165M

Project Completion: On-going

Project description: Sewerage networks, line of 700 to 1400 mm diameter with 37 km length – Sewerage network of 200 to 600
mm diameter with 87 km length – Domestic connections 23,400 domestic connections – Concrete corresponding number 2,079
applied – 3 pumping stations – parcel lines of 350/500/600 mm diameter with 16,730 m length. i

Wastewater Treatment plant Project

Project Name: Wastewater Treatment Plant in Sabya (EPC)

Owner:  Ministry of Environment, Water and Agriculture – Water Services Department, Jazan Region

Project Value: SR 151M

Project Completion: 2020

Project description: 44.000 m3/day wastewater treatment plant operated by orbital channel bioprocess system, pumping station, and 700mm D.I pipe bundle line with the length of 22000 m. i, to transfer the water from the pumping station to the treatment plant

Construction of Water networks Systems, Tanks and Pumping Stations Project

Project Name: Execution of networks, water tanks and pumping stations for FIFA Center in Jazan

Owner:  Ministry of Environment, Water and Agriculture – Jazan Region Water Services Department

Project Value: SR 114M

Project Completion: On-going

Project description: Ductile pipe transmission lines from the main reservoir to the sub-tanks through the pump rooms with a total length of 42,000 m.t., and polyethylene supply networks from the sub-tanks to residential areas with a total length of 142,600 m.t and 13 pumping stations of different capacities and 11 water tanks of different capacities

Wastewater collection system networks Project

Project Name:  Wastewater collection system networks for Al Quwaiiyah city

Owner: Ministry of Environment, Water and Agriculture – Gazan Water Services Department

Project Value: SR 169M

Project Completion: 2020

Project description: 35448m main conveyor line. Sub lines with diameters 200mm-500mm length 95,495m. Domestic connections 2102

Wastewater Treatment plant Project

Project Name: Ras Al Khair Wastewater Treatment Plant (EPC)

Owner: Royal Commission of Jubail and Yanbuaa

Project Value: SR 78M

Project Completion: 2022

Project description: Design and implementation of a wastewater treatment plant with a daily disposal rate of the extended
ventilation system = 12,500 m3/day

Water Transmission system From Dams Project

Project Name: Construction of Two water transmission System pipeline (EPC)

Owner: Ministry of Environment, Water and Agriculture

Project Value: SR 92M

Project Completion: 2018

Project description: Two water transmission System between the dams (Haleh-Yiba-Leith) and Shuaiba Water desalination plant, with 500 mm diameter, type (Welded carbon steel) and 104 km length

Water Transmission system From Purification Water Plant

Project Name: Wastewater collection system networks for Sabya city in Jazan

Owner: Ministry of Environment, Water and Agriculture – Department of Water Services in Qassim Region

Project Value: SR 73M

Project Completion: 2014

Project description: : Ductile water transmission lines with (150 , 250 , 300 , 500) mm diameter, length of 142 km , construction of left station and SCADA system

Wastewater Collection System Networks Project

Project Name: Afif Wastewater collection system

Owner: Ministry of Environment, Water and Agriculture – Riyadh Water Services Department

Project Value: SR 88M

Project Completion: 2014

Project description:

Supply and installation of 11 km of fiberglass pipes (GRP) – Supply and installation of 120 km of pottery pipes
with diameters from 200 mm to 800 mm

Water Supply Program in (Riyadh - Jazan - Al Qassim - Jazan - Madina)

Project Name: : Water and sanitation connections agreements in Riyadh – Qassim – Jazan – Madina (Isal project)

Owner: Water and Sewage Services

Project Value: SR 97M

Project Completion: On-going

Project description: Supply and installation of house connections for water and sanitation, various water network lines and sewage service lines required

Electricity Projects

Project Name: Unified Contract for Distribution Networks

Owner: Saudi Electricity Company (SEC)

Project Value: SR 123M

Project Completion: On-going

Project description: Installation, removal, replacement, modification and maintenance of low and medium voltage air and ground
distribution networks up to 36 kV, under electrical management (Qassim-Jazan)